Dubai · Fine jewellery manufacturing & bespoke
La Roche · Dubai

How to choose a gold jewellery manufacturer in Dubai

Questions for retailers, designers and brands about samples, production responsibility, pricing and the next order.

Gold-toned round ring with turquoise-blue and pearly white details

When comparing gold jewellery manufacturers in Dubai, start with relevant samples, a complete quotation and a clear account of who handles each production stage. These will tell you more about a supplier's suitability for your collection than a general portfolio or headline making charge.

For retailers, designers and brands, the assessment should cover the first sample and future orders. Use the questions below to discuss costs, quality, design files and delivery before committing to production.

Define the collection you want to manufacture

Describe the product categories, intended customer and price position. Separate a one-off customer project from a sample collection or a repeat production order. These projects can require different development work, approval steps and production planning.

Break quantities down by design and variation. An order of twenty pieces might mean twenty identical pendants or several ring designs in different sizes, colours and stone combinations. A supplier needs that distinction to assess the work and give a useful quotation.

If your range is still being developed, identify the parts that are settled and the decisions where you need input. A manufacturer can then discuss feasibility without treating every early reference as a final specification. Keep your design intention clear, especially the details that define the collection.

Ask for a relevant sample.

Look for work that demonstrates the construction and finish your project requires. An attractive plain band does not answer every question about an articulated bracelet, a matched pair of earrings or a complex setting. Explain what you need the sample to demonstrate.

Where appropriate, request a sample of your own design before approving a batch. Agree its cost, materials, revisions and delivery date. Clarify whether it is intended to test appearance, fit, construction or all three, and whether it will become the reference for production.

Record observations while the sample is available. Identify the relevant view or measurement and separate a design change from a manufacturing issue. This prevents a vague instruction such as “make it better” from becoming the basis for the next production stage.

Understand who is responsible at each stage.

Ask which work is performed directly and which uses specialist partners. The answer should cover design, CAD, casting, finishing, setting and inspection as relevant to your order. A partner arrangement needs clear responsibility for the finished result and for communication along the way.

Request one point of contact for decisions and approvals. Ask who holds supplied stones or materials at each stage, how transfers are recorded and who handles a problem if work needs to be corrected. Confirm the proposed terms before handing over valuable or irreplaceable items.

Ask La Roche to confirm the responsibilities and specialist partners involved in your project. Our pear-shaped solitaire case study shows one project from CAD to finishing, with the stone sourced externally. The project scope and responsibilities should be agreed for your own order.

Compare the full quotation, including development.

Give each shortlisted manufacturer the same brief and ask for the same deliverables. If one quote includes CAD and a sample while another covers production only, their headline totals are not directly comparable. Request the missing breakdown before judging the difference.

A practical trade quotation comparison
StageQuestions to resolve
DevelopmentWhat design, CAD and sample work is included? How many revisions, and which deliverables?
MaterialsWho supplies the gold and stones? What specification and pricing basis apply?
ProductionWhat does the making charge include? Are setting, finishing and inspection covered?
CompletionWhat documentation, packaging and delivery are included? What remains payable?
ChangesHow are revisions, substitutions, final weights and additional work agreed and priced?

Clarify quote validity and payment milestones. If material prices or final weights can change the total, ask for the method of calculation in advance. The practical question is what you will owe for the approved finished order, and under which circumstances that amount can change.

Separate one-off development fees from the cost of repeat production. Ask which CAD files or moulds can be reused, whether later orders incur additional fees and how design revisions would be priced.

Confirm minimum order quantities by design

Ask about minimum quantities by design, material and variation, rather than requesting one general minimum order number. Include your planned first batch and an indication of possible replenishment. An opening assortment and an identical-design reorder may have different requirements.

If the proposed quantity is too large for your launch, discuss alternatives openly. You might review the number of variations, develop fewer designs first or separate sampling from the batch decision. Do not assume a manufacturer can offer a particular arrangement until it has been quoted.

La Roche has no minimum order quantity. Samples and CAD revisions are available. Development scope, fees, revision rounds and timing are agreed for each project. Include the number of pieces required for every design, size and material variation in your enquiry.

Agree sample approval and quality checks

Agree the features that will be checked against the approved sample and specification. Depending on the piece, these may include dimensions, fit, stone alignment, surface finish, functional parts and areas in contact with the skin. Identify the details that are especially important to your design.

Ask the manufacturer to propose appropriate tolerances instead of borrowing arbitrary numbers from an unrelated product. Confirm how a permitted variation differs from a defect. Record the agreed measurements and finishes with photographs or reference views where useful.

Discuss the inspection and issue-reporting process before production. Who checks the finished pieces, what evidence accompanies handover, and how will a concern be assessed? Agree the process for correction, responsibility for transport and any relevant timing in the project terms.

Build approvals into the schedule.

Request a schedule with dates for design review, sample approval, material confirmation, production and handover. Ask which approvals or materials are needed before each stage can begin.

Your own response time belongs in this plan. If several people in your business approve design or expenditure, decide who gives the final instruction. Consolidated feedback is easier to act on than conflicting messages sent to different workshop contacts.

State whether your deadline means the sample reaching you, the order leaving the workshop or goods arriving for a launch. Ask for a revised schedule when the scope changes. A requested launch date does not become a confirmed manufacturing commitment simply because it appears in the brief.

Discuss files and design rights before development.

Ask which files and physical items you will receive, which remain with the manufacturer and how future access works. The conversation can include CAD files, production models, moulds, approved drawings and sample records. Do not assume that paying a development fee settles every question.

Set out confidentiality and permitted use in your agreement. If exclusivity matters, define its scope for the relevant design rather than relying on a broad verbal assurance. Discuss permission to photograph or display the finished work, especially when your customer's project has not launched.

Share only references and files you are entitled to use. If you are arranging production on behalf of another business, establish who can approve the design and manufacturing instructions.

Plan the second order while approving the first.

Ask how an approved design will be identified on a reorder. Use a consistent product reference and retain the accepted specification, sample record and subsequent changes. A new quotation should make clear whether it repeats that specification or proposes an alternative.

Discuss material availability, quantity requirements and scheduling again for each order. An earlier price or lead time should not be assumed to remain available indefinitely. If a component or stone specification changes, agree how the substitution will be reviewed.

After launch, collect specific product feedback that could inform the next batch. Separate a customer preference from an issue requiring correction. A concise record gives the manufacturer something concrete to assess without losing the design decisions that already worked.

Prepare your manufacturing enquiry

Prepare a single project summary for your initial discussions. Include your business, the intended collection, design references, material and stone requirements, quantities by variation, target cost and launch timing. State whether you need design development, samples or production from approved files.

Use our manufacturing brief checklist to organise the details. Then compare how each prospective partner responds: which questions they ask, which assumptions they identify and how clearly they describe the next step. A useful response should reduce uncertainty about your project.

La Roche works with retailers, designers and brands from Gold and Diamond Park in Dubai. Explore our fine-jewellery manufacturing services or private-label production for a collection sold under your own brand.

Discuss your collection.

Send the designs, materials, approximate quantities and target date. Include your current development stage so we can review the work required.

Send a manufacturing brief

See how the stages fit together in our project process.